Capabilities · 04
Rapid Prototyping
First articles on the schedule your program actually keeps — with the physics-honest reasons why.
Capability 04
Two Weeks, Because the Queue Is Ours
Fast prototypes aren't magic — they're vertical integration. Blanks, fabrication, coating, and metrology under one roof means your first article never waits in another company's queue.
| Lane | Typical Delivery | Scope | Best For |
|---|---|---|---|
| Standard Prototype | 3 – 4 weeks | 1–10 pcs, stock material, standard coatings | Design validation, first articles |
| Expedite | As fast as 2 weeks | 1–5 pcs, in-stock substrate, catalog coating | Program-critical demonstrations |
| Critical / AOG | Quoted case-by-case | Single pieces, dedicated machine time | Line-down and fielded-system failures |
| Bridge Production | Rolling | Short runs while volume tooling ramps | Keeping integration lines fed |
Deliveries assume material in stock (we hold ZnSe, Ge, Si, fused silica). Exotic melts, large blanks, and custom filter coatings add their own lead times — we quote the truth, not the wish.
What Makes Prototypes Fast — or Slow
An Engineer's Honest List
▲
Speeds It Up
- Diamond-turnable materials (Ge, ZnSe, chalcogenide)
- Catalog coating bands (1064 nm, 10.6 µm, 3–5, 8–12 µm)
- Tolerances from our Standard column
- Diameters 10–100 mm — inside every machine's sweet spot
- A STEP file plus a one-page spec — not a 40-page SOW
▼
Slows It Down
- Sapphire and large CaF₂ (slow material removal, thermal care)
- Custom narrow bandpass filters (witness runs included)
- λ/10 with 10-5 on soft crystals — possible, not fast
- Serialized flight documentation on a one-off
- Undefined AOI/polarization on coating specs — we must ask
Every first article ships with engineering feedback: what measured where, which tolerances were comfortable, which were tight, and what we would change before production. A prototype that teaches nothing is half wasted.
Need It in Two Weeks?
Send the drawing today and we'll confirm the lane, the date, and the price by tomorrow.
Start an Expedite